Cladding Testing And Replacement In City Of London

The skyline of the City of London is defined by a dense concentration of high-rise commercial and residential architecture. For building owners and managing agents within the Square Mile, maintaining the integrity of the external building envelope is a significant operational priority. Cladding Testing and Replacement in City of London requires a nuanced understanding of the unique logistical constraints, technical requirements, and rigorous safety standards inherent to this specific urban environment.

On this page
  1. 1.Key Takeaways
  2. 2.Defining Cladding Testing and Replacement
  3. 3.The Importance of Façade Integrity in the Square Mile
  4. 4.Core Concepts of Cladding Testing
  5. 5.Options for Remediation and Repair
  6. 6.Technical Considerations for High-Rise Projects
  7. 7.The Cladding Replacement Process: Step-by-Step
  8. 8.Commercial and Financial Impact

Cladding testing in City of London

Whether addressing concerns regarding fire safety, water ingress, or material degradation, the process of investigating and remediating a façade must be systematic. Identifying defects early through professional cladding testing ensures that interventions are proportionate, moving from localised repairs to full-scale recladding only when necessary. This guide outlines the technical pathways for assessing, remediating, and replacing cladding systems in one of the world’s most demanding property markets.

Key Takeaways

  • Regulatory Compliance: All works must align with the Building Safety Act 2022 and updated Building Regulations (Approved Document B).
  • Systematic Investigation: Intrusive inspections are essential to identify the composition of the external wall system beyond the visible panel.
  • Individual Assessment: Not all cladding issues require replacement; many defects can be resolved through targeted remediation or repair.
  • Logistical Complexity: Projects in the City of London necessitate expert planning for access, including mast climbers, cradles, and specialized scaffolding.
  • Insurance & Valuation: Professional testing and EWS1 certification are critical for securing insurance and maintaining asset value.
  • Occupant Safety: Minimising disruption to residents and commercial tenants is a core component of any remediation strategy.

Defining Cladding Testing and Replacement

Cladding Testing and Replacement in City of London refers to the professional evaluation and subsequent physical remediation of a building’s external wall system to ensure structural integrity, thermal performance, and fire safety compliance. This process involves identifying hazardous or failing materials and implementing solutions ranging from minor fixing repairs to the installation of new, non-combustible façade systems.

  • Inspection: Visual and intrusive surveys to check for damage, corrosion, or incorrect installation.
  • Testing: Laboratory analysis of materials (such as ACM or HPL) to determine fire ratings and performance.
  • Remediation: Correcting specific defects like missing cavity barriers or failed fire stops.
  • Replacement: The complete removal of non-compliant or end-of-life systems and the installation of modern alternatives.

The Importance of Façade Integrity in the Square Mile

The City of London presents a unique set of challenges for façade management. The proximity of buildings, the height of the structures, and the high occupancy levels mean that any failure in the external wall system—whether fire-related or structural—carries elevated risk. Understanding the current condition of a building is not merely a matter of maintenance; it is a statutory and financial necessity.

Regulatory Drivers

Following the introduction of the Building Safety Act, the responsibilities of the "Accountable Person" have been clearly defined. For buildings over 18 metres (or seven storeys), there is a legal requirement to demonstrate that all reasonable steps have been taken to prevent a major incident. Professional testing provides the evidence base for these safety cases.

Furthermore, the requirements of the EWS1 (External Wall System) process continue to influence the lending market. Many property transactions in the City cannot proceed without a clear assessment of the cladding, often requiring intrusive testing to confirm the nature of the insulation and cavity barriers hidden behind the external panels.

Managing Material Degradation

While fire safety is a primary concern, cladding systems also face environmental stressors. In the high-density environment of the City, façades are exposed to significant wind loads, atmospheric pollutants, and thermal expansion. Over time, these factors can lead to the failure of fixings, the perishing of sealants, and the delamination of panels, which may necessitate targeted repairs or eventual replacement.

Core Concepts of Cladding Testing

Before any remedial work is commissioned, a thorough understanding of the existing wall build-up is required. A "one-size-fits-all" approach is never appropriate for complex London high-rises. The investigation phase must be robust enough to inform a detailed scope of work.

Visual and Thermal Imaging Surveys

Initial assessments often begin with high-resolution photography and thermal imaging. Drones are frequently utilised in the City to inspect difficult-to-reach areas without the immediate need for expensive access equipment. Thermal imaging can highlight areas of heat loss or moisture entrapment, which often point to underlying defects in the insulation or vapor barriers.

Intrusive Investigations

Visual inspections have limits. An intrusive survey involves the removal of small sections of the cladding—often referred to as "opening up" works—to inspect the internal components. This allows specialists to verify:

  1. The presence and correct installation of cavity barriers.

  2. The type of insulation material used (e.g., combustible vs. non-combustible).

  3. The condition of the secondary steelwork or timber framing.

  4. The adequacy of the fixings and rails.

Laboratory Analysis

When the composition of a panel is unknown, samples are sent for laboratory testing. This is particularly common for Aluminium Composite Materials (ACM) or High-Pressure Laminates (HPL). The testing determines the calorific value of the material and its fire reaction classification (e.g., Class A1, A2, or B-rated), which dictates whether the material can legally remain on the building.

Cladding testing in City of London

Options for Remediation and Repair

A common misconception is that all identified cladding issues require the complete removal of the façade. At CladdingTesting.com, we prioritise a tiered approach, identifying when repairs are sufficient to extend the life of the building envelope safely.

Targeted Façade Repairs

In many instances, the primary cladding panels are safe, but the peripheral components are failing. This can include the replacement of individual damaged panels, the re-application of high-performance sealants, or the reinforcement of loose fixings. These repairs are often the most cost-effective way to maintain a building’s weather-tightness and aesthetic appeal.

Cladding Remediation

Remediation is often the middle ground between repair and replacement. This typically involves keeping the external panels but addressing internal safety defects. A frequent remediation project in the City involves retrofitting cavity barriers. These are essential components that prevent the spread of fire and smoke within the cavity behind the cladding. If these were omitted during original construction, they can often be installed by temporarily removing panels and then reinstating them.

Complete Recladding and Replacement

When a system is deemed non-compliant or structurally unsound, Cladding Testing and Replacement in City of London becomes a full-scale construction project. This involves the systematic removal of all combustible or failing materials, including insulation and rails, and replacing them with a fully tested, A-rated non-combustible system. This not only ensures safety but can significantly improve the building’s thermal efficiency and environmental credentials.

Technical Considerations for High-Rise Projects

Delivering cladding works in the City of London requires expertise in managing "live" buildings. Unlike new-build projects, remediation takes place while residents are living in their homes or businesses are operating. This introduces complexities in sequencing and logistics.

Access Solutions in Dense Urban Areas

Space is at a premium in the Square Mile. Traditional scaffolding is not always feasible due to pavement licenses, traffic management, and the sheer height of the buildings. We often employ alternative access methods:

Mast Climbers: Ideal for tall, vertical elevations, providing a stable platform for heavy material handling. Cradles (BMUs): Often used for lighter repair works or where the building’s roof structure supports permanent access. Rope Access: Highly efficient for initial testing, minor repairs, and inspections where minimal disruption is required.

Managing the Interface

A façade is not a standalone element; it interfaces with windows, balconies, roof systems, and structural slabs. When replacing cladding, these interfaces must be carefully managed to ensure the building remains weather-tight throughout the duration of the works. Specialist detailing is required to ensure that new fire-stopping materials align perfectly with existing structural elements.

The Cladding Replacement Process: Step-by-Step

  1. Initial Assessment: A desktop review of O&M manuals and previous fire risk assessments.
  2. Site Investigation: On-site cladding testing including intrusive surveys and material sampling.
  3. Technical Report: A detailed breakdown of findings, risk levels, and recommended actions.
  4. Design and Specification: Working with architects and fire engineers to design a compliant replacement or remediation system.
  5. Procurement: Sourcing materials that meet current A1/A2-s1, d0 fire ratings.
  6. Implementation: Phased removal and installation, often elevation by elevation to manage resident impact.
  7. Handover and Certification: Final inspections, sign-off by Building Control, and issuance of completed EWS1 forms or safety cases.

Commercial and Financial Impact

The cost of cladding works can be substantial, but the cost of inaction is often higher. For commercial landlords in the City, a building with identified cladding defects can become a "stranded asset"—difficult to sell, refinance, or insure. By proactively managing Cladding Testing and Replacement in City of London, owners protect their long-term investment.

There are also funding avenues to consider, such as the Building Safety Fund (BSF) for residential buildings. Navigating these applications requires technical evidence and professional costings, which are derived directly from the initial testing and survey phases.

Common Challenges in the City of London

Working in the City introduces specific hurdles that require an experienced contractor to navigate. These include:

Noise Restrictions: Strict hours of operation to avoid disturbing neighbouring offices and residents. Waste Management: Limited space for skips and storage requires "just-in-time" delivery and removal of materials. Structural Loadings: Ensuring that new, modern cladding systems do not exceed the original design weight of the building’s frame. Planning Permissions: Significant changes to the appearance of a building during recladding may require consent from the City of London Corporation, especially in conservation areas.

Cladding testing in City of London

Last updated

Services

Services available in City of London

  • Cladding Replacement

    For building owners and property managers across the United Kingdom, cladding replacement has shifted from an aesthetic or maintenance consideration to a critical matter of safety, compliance, and asset protection. The complexity of modern external wall systems means that replacing a façade is no longer a simple construction task; it is a multi-disciplinary engineering project that requires a deep understanding of fire dynamics, structural load, and building regulations.

  • Recladding A House

    Recladding a house is the process of removing a building’s existing external wall covering and replacing it with a new, compliant system. In the UK, this work is typically undertaken to resolve issues involving water ingress, structural deterioration, thermal inefficiency, or fire safety non-compliance in multi-storey residential blocks.

  • PAS 9980 Assessment

    A PAS 9980 assessment is a formal methodology used to evaluate the fire risk of external wall systems on multi-storey residential buildings. Introduced by the British Standards Institution (BSI) in early 2022, it provides a structured framework for competent professionals to determine whether a building’s cladding and wall construction pose an acceptable or unacceptable risk to life safety. Rather than focusing solely on whether materials are combustible, the assessment considers the entire wall assembly and how a fire might spread across the building envelope.

  • FRAEW Assessment

    Understanding the safety and compliance profile of a building’s exterior is now a central requirement for property professionals across the United Kingdom. A FRAEW assessment is a specialised technical evaluation of the external wall construction of a multi-storey, multi-occupied residential building. Its purpose is to assess the fire risk contributed by the wall system and determine whether remediation or mitigation is necessary to ensure resident safety.

  • Cladding Survey

    A cladding survey is a comprehensive technical assessment of a building's external wall system, designed to identify material composition, installation quality, and structural integrity. It involves a systematic investigation of the façade—including panels, insulation, cavity barriers, and fixings—to determine compliance with building regulations and assess the need for repair, remediation, or replacement.

  • Intrusive Cladding Survey

    Understanding the internal composition of a building’s facade is a critical requirement for modern property management. An intrusive cladding survey is a detailed physical investigation where specialist engineers open up specific sections of an external wall system to inspect hidden components. Unlike visual inspections, these surveys provide definitive evidence regarding the presence of combustible materials, the adequacy of cavity barriers, and the structural integrity of fixing systems.

  • External Wall Survey

    An external wall survey is a comprehensive technical assessment of a building’s outer envelope, designed to evaluate the safety, compliance, and physical condition of the entire façade system. This professional inspection identifies defects in cladding materials, insulation, cavity barriers, and structural fixings to ensure the building meets current UK fire safety regulations and performance standards.

  • EWS1 Survey

    The EWS1 survey (External Wall System) is a technical assessment process designed to evaluate the fire safety of a building's external wall construction. Introduced by the Royal Institution of Chartered Surveyors (RICS), it results in an EWS1 form that confirms whether the cladding, insulation, and cavity barriers meet specific safety criteria or if remediation is required to mitigate risk. This process is essential for residential high-rise buildings, particularly those over 11 metres, to facilitate mortgage lending and ensure resident safety.

  • Cavity Barrier Remediation

    Cavity barrier remediation is the technical process of identifying, correcting, or replacing defective fire-stopping measures within the external wall systems of a building. It ensures that the "cavity"—the gap between the structural wall and the external cladding—is properly compartmentalised to prevent the rapid spread of fire and smoke. In the UK, this work is essential for aligning high-rise and multi-storey buildings with current Building Regulations and fire safety standards.

  • Fire Stopping Remediation

    Fire stopping remediation is the systematic process of identifying, repairing, or replacing failed and non-compliant fire protection measures within a building's service penetrations, joints, and cavities. In the context of the external building envelope, this specifically involves restoring the integrity of cavity barriers and fire breaks to prevent the spread of smoke and flame through the facade system.

  • Rainscreen Cladding Remediation

    Rainscreen cladding remediation refers to the systematic process of investigating, repairing, or replacing external wall systems that have failed to meet safety, structural, or weather-performance standards. In the UK, this typically involves addressing non-compliant combustible materials, defective cavity barriers, or water ingress issues in high-rise and multi-occupancy buildings.

  • Higher Risk Building Cladding Remediation

    Higher risk building cladding remediation is the technical process of identifying, removing, or upgrading non-compliant external wall systems on buildings that meet specific height or occupancy criteria under UK law. In the United Kingdom, this primarily concerns residential buildings over 18 metres or seven storeys in height, where the presence of combustible materials presents a significant risk to life safety. Remediation is not merely a cosmetic update; it is a complex engineering and legal requirement designed to ensure that the building envelope prevents the spread of fire and meets the

  • Unsafe Cladding Removal

    The safety of a building’s external wall system is a critical concern for property owners and managers across the United Kingdom. Following changes in legislation and building regulations, many structures have been identified as having hazardous façade materials that require immediate attention. Unsafe cladding removal is the systematic process of identifying, stripping, and replacing external wall components that pose a significant fire risk or fail to meet current compliance standards.

  • Cladding Water Ingress

    Cladding water ingress refers to the uncontrolled penetration of moisture through a building's external wall system into the internal structure or cavity. This failure in the building envelope typically occurs due to defective seals, poor installation of flashing, damaged panels, or systemic design flaws. Left unaddressed, it leads to structural decay, insulation failure, and compromised internal environments.

  • Spandrel Panel Remediation

    Spandrel panel remediation is the technical process of investigating, repairing, or replacing the non-vision infill panels located between the glazed areas of a building's façade. These panels, often found in curtain walling and ribbon window systems, are critical for maintaining the thermal performance, moisture resistance, and fire safety of the external wall envelope.

  • Cladding Subframe Replacement

    Ensuring the structural integrity of a building’s exterior requires more than just inspecting the visible panels. The cladding subframe replacement process involves the systematic removal and renewal of the hidden metal or timber framework that secures the rainscreen to the building structure. This work is essential when the original grid has suffered from corrosion, systemic installation defects, or fails to meet modern fire safety standards for high-rise residential and commercial properties.

  • ACM Cladding Remediation

    ACM cladding remediation refers to the professional process of identifying, assessing, and addressing the fire safety and structural risks associated with Aluminium Composite Material panels on a building's exterior. This systematic approach involves determining whether panels require localised repair, specific safety upgrades, or a complete replacement of the external wall system to meet current UK building regulations and the Building Safety Act 2022.

  • Aluminium Cladding Remediation

    Aluminium cladding remediation refers to the systematic process of investigating, repairing, or replacing aluminium-based external wall systems that have been identified as defective, non-compliant, or deteriorating. This technical intervention ensures that the building envelope meets current UK Building Regulations, particularly regarding fire safety, structural stability, and moisture management.

  • Combustible Insulation Replacement

    In the wake of evolving fire safety regulations in the UK, combustible insulation replacement has become a priority for building owners and property managers. The presence of flammable materials within an external wall system poses significant risks to life safety and property value. Addressing these issues requires a systematic approach to identification, technical assessment, and remedial execution.

  • External Wall Insulation Remediation

    External wall insulation remediation is the process of inspecting, repairing, or replacing a building's external insulation system to ensure it meets modern fire safety, thermal performance, and structural standards. This specialist intervention addresses systemic failures in EWI systems, such as water ingress, delamination, or the presence of combustible materials that no longer comply with UK Building Regulations, specifically for buildings over 11 or 18 metres.

  • HPL Cladding Remediation

    HPL cladding remediation refers to the systematic process of investigating, removing, or modifying external wall systems that incorporate High-Pressure Laminate panels. In the UK, this work is typically driven by the need to ensure building safety and compliance with the Building Safety Act and updated Fire Safety Regulations. The process involves identifying combustible materials, assessing the risk to the building envelope, and implementing engineered solutions to achieve a non-combustible or fire-safe finish.

  • Metal Cladding Remediation

    Metal cladding remediation refers to the professional process of identifying, investigating, and resolving defects within metal-based building envelope systems. It encompasses a range of actions from localised repairs and component replacement to full-system overhauls. This process ensures the structure remains weather-tight, aesthetically sound, and fully compliant with current UK fire safety and building regulations.

  • Cladding Fire Safety Survey

    Following the Grenfell Tower tragedy, the landscape of building safety in the United Kingdom changed permanently. A cladding fire safety survey is now a fundamental requirement for the management of high-rise and multi-storey buildings. These technical assessments are designed to identify combustible materials, verify the presence of adequate fire-stopping, and ensure the entire external wall system meets current life-safety standards.

  • Cladding Inspection

    A cladding inspection is a technical assessment of a building’s external wall system to evaluate its condition, safety, and regulatory compliance. It involves a systematic review of the outer skin, insulation, cavity barriers, and structural fixings to identify defects such as material deterioration, water ingress, or non-compliant fire-safety components. This process provides building owners with the data required to plan repairs, remediation, or full replacement.

  • Cladding Investigation

    A cladding investigation is a technical assessment of a building’s external wall system to identify defects, material composition, and compliance with safety standards. This process involves physical inspections, intrusive testing, and material analysis to determine if the façade is structurally sound, fire-safe, and performing as intended.

  • Curtain Wall Remediation

    Curtain wall systems are among the most complex elements of a building’s exterior. These non-structural outer coverings, typically comprising aluminium frames, glass infill panels, and spandrel sections, are designed to protect the structure from the elements while providing aesthetic appeal. However, when these systems fail due to age, poor installation, or material degradation, the result is often water ingress, thermal inefficiency, or structural instability. Curtain wall remediation is the professional process of identifying these failures and implementing targeted engineering solutions to

  • Balcony Cladding Remediation

    Balcony cladding remediation is the technical process of identifying, managing, and rectifying safety and structural defects within the external wall systems surrounding balconies. In the United Kingdom, this often involves addressing non-compliant combustible materials, inadequate fire stopping, and failed waterproofing interfaces that pose risks to life safety and building longevity.

  • Breather Membrane Replacement

    A breather membrane replacement is a specialist remediation process involving the removal of existing external wall layers to install a new, high-performance water-resistant but vapour-permeable layer. This critical component protects the building’s primary structure and insulation from moisture ingress while allowing internal water vapour to escape, preventing interstitial condensation and structural decay.

  • Cladding Bracket Replacement

    Cladding bracket replacement is a technical remedial process involving the removal of failed or non-compliant support components within a building's external wall system and installing new, structurally sound fixings. This intervention ensures the façade remains securely attached to the primary structure, maintains required cavity depths, and meets modern fire safety standards. It is typically required when inspections reveal structural fatigue, significant corrosion, or the presence of combustible components within the "helping hand" bracket system.

  • Cladding Rail Replacement

    Cladding rail replacement is the process of removing and renewing the structural framework that secures external façade panels to a building’s primary structure. This infrastructure, often hidden behind the visible rainscreen, is critical for managing wind loads, supporting the weight of the cladding, and ensuring the fire safety performance of the external wall system.

  • Parapet Cladding Remediation

    Parapet cladding remediation is the technical process of assessing, repairing, or replacing the external façade elements located at the topmost edge of a building’s wall system. These areas, known as parapets, serve as critical junctions between the roof and the external wall, requiring precise fire stopping, structural integrity, and weatherproofing to ensure the safety of the entire building envelope.

  • Fire Barrier Remediation

    Fire barrier remediation is the technical process of correcting, repairing, or replacing failed cavity barriers and fire stops within a building’s external wall system. This specialist work ensures that in the event of a fire, the concealed gaps behind cladding panels do not act as chimneys that allow flames and smoke to spread rapidly across the facade.

  • Brick Slip Cladding Remediation

    Brick slip cladding remediation refers to the systematic process of investigating, repairing, or replacing decorative thin-clay brick veneers that have failed due to structural issues, moisture ingress, or non-compliance with fire safety regulations. This technical intervention ensures the external wall system meets current UK Building Regulations, specifically regarding thermal performance and fire resistance for multi-storey buildings.

  • Fibre Cement Cladding Remediation

    Fibre cement cladding remediation refers to the systematic process of identifying, testing, and correcting defects in external wall systems that use fibre-reinforced cementitious panels. This professional intervention addresses issues ranging from structural instability and moisture-related degradation to fire safety non-compliance, ensuring the building envelope meets current UK Building Regulations and British Standards.

  • GRC Cladding Remediation

    GRC cladding remediation refers to the systematic process of identifying, testing, and rectifying defects in Glass Reinforced Concrete (GRC) facade systems. This process encompasses everything from localised structural repairs to comprehensive GRC cladding replacement where panels have reached the end of their service life or fail to meet modern safety standards.

  • Insulated Panel Replacement

    External wall systems using pre-fabricated units are a staple of modern UK construction. Insulated panel replacement refers to the systematic removal and substitution of composite or sandwich panels that no longer meet thermal, structural, or fire safety standards. This process is essential for maintaining the building envelope’s integrity and ensuring compliance with the Building Safety Act and updated Building Regulations.

  • SFS Remediation

    SFS remediation refers to the professional investigation, structural repair, or full-scale replacement of Steel Framing Systems (SFS) within a building’s external wall. In the UK, this process is typically required when the light gauge steel framing—which provides the structural skeleton for the façade—is found to be corroded, incorrectly installed, or failing to meet modern fire safety and thermal performance standards. A successful remediation strategy ensures the structural integrity of the building envelope while ensuring compliance with the Building Safety Act and updated Building Regulat

  • Sheathing Board Replacement

    In the complex hierarchy of an external wall system, the sheathing board occupies a critical position. Often hidden behind the decorative cladding and insulation layers, it serves as the primary structural skin of the building’s frame. When this component fails due to moisture ingress, structural movement, or fire safety non-compliance, sheathing board replacement becomes a technical necessity to ensure the long-term viability and safety of the property.

  • Steel Cladding Remediation

    Steel cladding remediation is the process of inspecting, repairing, or replacing external metal wall systems to ensure they meet modern fire safety, structural, and thermal standards. In the UK, this work is essential for high-rise residential and commercial buildings where existing steel façades may have deteriorated or were originally installed without adequate cavity barriers and non-combustible insulation.

  • Terracotta Cladding Remediation

    Terracotta cladding remediation refers to the specialist process of identifying, managing, and resolving defects within external wall systems that utilise fired-clay tiles or rainscreen panels. This technical intervention ensures that the building envelope remains structurally sound, weather-tight, and compliant with current UK fire safety regulations and Building Regulations (specifically Approved Document B).

  • Timber Cladding Remediation

    External timber facades have long been a popular choice for UK architects and developers, offering a natural aesthetic and strong environmental credentials. However, as buildings age and regulatory standards evolve—particularly following the Building Safety Act 2022—many property owners are finding that these systems require significant intervention.

  • Zinc Cladding Remediation

    Zinc cladding remediation is the technical process of identifying, managing, and resolving defects in zinc-based facade systems. This work typically involves structural inspections, moisture analysis, and the repair or replacement of non-compliant components. Effective remediation ensures that the external wall system meets modern fire safety standards, provides weather protection, and maintains the building’s aesthetic integrity.

  • Cladding Adhesion Testing

    Cladding adhesion testing is a critical technical assessment used to determine the structural integrity of bonded façade systems. This process measures the tensile strength of the bond between the cladding material and its substrate, ensuring the system can withstand wind loads, thermal expansion, and environmental degradation. For building owners and managing agents, these tests provide empirical evidence of whether a façade remains safe or requires remedial intervention.

  • Cladding Testing

    Professional cladding testing is a rigorous process used to evaluate the safety, integrity, and regulatory compliance of a building's external wall system. It involves physical sampling, laboratory analysis, and on-site inspections to identify material composition, fire performance, and structural stability. This technical assessment ensures that façades meet current UK building regulations and provides a clear pathway for necessary remediation or repair works.

  • Cladding Pull Out Testing

    Ensuring the structural stability of a building envelope requires more than a visual assessment of the exterior panels. Cladding pull out testing is a vital onsite procedure used to measure the physical load-bearing capacity of fixings and anchors within an external wall system. By applying a controlled tensile load to a fastener, engineers can verify that the substrate—whether it be concrete, masonry, or steel—is capable of holding the cladding system securely under environmental stresses such as wind loading and self-weight.

  • Cladding Wind Load Assessment

    A cladding wind load assessment is a technical engineering evaluation used to determine the specific wind pressures a building’s external wall system must withstand. It involves calculating peak positive (pressure) and negative (suction) forces based on the building's height, location, and geometry to ensure that panels, fixings, and subframes remain structurally secure under extreme weather conditions.

  • GRP Cladding Remediation

    Glass Reinforced Plastic (GRP), often referred to as fibreglass, has been a staple in the UK construction industry for decades. Its lightweight nature, versatility in moulding, and durability made it a popular choice for architectural features, decorative cornices, and modular wall panels. However, as building safety standards evolve and the long-term performance of these materials becomes clearer, many property owners now face the technical challenge of GRP cladding remediation.

Cladding questions in City of London

An initial visual inspection for a standard City building can often be completed in one to two days. However, a full intrusive investigation—including the removal of panels at various heights and laboratory testing of materials—typically takes one to two weeks, depending on the complexity of the façade and access requirements.