Cladding Testing

Glossary · Single word

Scaffolding

In short

a temporary structure used to support workers and materials during construction

Scaffolding is a fundamental temporary structure in UK cladding remediation, providing essential access for testing and replacement. This article details its technical role, regulatory requirements under CDM 2015, and the logistical considerations for building owners and managers.

Last updated

Appears 470 times across this site

Definition and Function in Cladding Operations

Scaffolding is a temporary structure used to support workers and materials during construction, maintenance, and remedial works. In the context of the UK cladding industry, it provides the primary means of access for technical assessments, the removal of non-compliant materials, and the installation of new external wall systems. Unlike mobile elevating work platforms (MEWPs) or mast climbers, traditional tube-and-fitting or system scaffolding provides a continuous, multi-level platform that encompasses large sections of a building’s facade simultaneously.

For cladding projects, scaffolding serves two fundamental purposes. First, it enables operatives to reach the building envelope safely at height, facilitating the precise manual tasks required for fixing rails, membranes, insulation, and rainscreen panels. Second, it provides a stable environment for the storage of lightweight materials and the mounting of temporary weather protection. The design of the scaffold must account for the specific loads imposed by the cladding materials and the environmental conditions, such as wind loading, which can be significant on high-rise structures.

Applications in Testing, Repair, and Replacement

The lifecycle of cladding remediation frequently begins with intrusive inspections. While initial surveys might be conducted via rope access or drones, a detailed EWS1 (External Wall System) assessment or a comprehensive fire risk appraisal of external walls (FRAEW) often requires physical samples to be taken from multiple points. Scaffolding may be erected for these targeted "opening up" works to ensure that engineers can safely examine the cavity barriers, fixings, and substrate without the limitations of motion inherent in other access methods.

During the replacement phase, scaffolding becomes a critical piece of site infrastructure. Cladding replacement is rarely a simple "like-for-like" swap; it often involves the total strip-back of the external wall to the structural slab or lightweight steel frame. Scaffolding allows for the systematic removal of combustible materials and the subsequent phased installation of non-combustible alternatives. It also facilitates the installation of vertical and horizontal cavity barriers, which must be fitted with high precision to ensure the integrity of the fire-stopping measures within the wall cavity.

Interaction with Building Fabric and External Wall Systems

The interface between the scaffold and the building fabric is a complex engineering consideration. Scaffolds are typically secured to the building using physical ties. In cladding projects, these ties must penetrate the external wall system to reach the structural substrate. This creates a logistical challenge: the cladding must be installed around the ties, and the resulting gaps must be remediated once the scaffold is struck (dismantled).

Furthermore, the presence of scaffolding alters the building’s profile. Debris netting or fire-retardant sheeting is often applied to the exterior of the scaffold to protect the public and contain dust. However, this sheeting increases the "sail area" of the structure, necessitating rigorous calculations regarding the wind loads transferred to the building’s primary frame. The choice of sheeting material is also governed by fire safety standards, particularly on high-rise residential buildings, to ensure that the temporary structure does not contribute to the spread of fire during the construction phase.

Regulatory Context in England and Wales

The use of scaffolding in cladding works is governed by a robust framework of health and safety legislation and technical standards. The Work at Height Regulations 2005 set out the legal requirements for planning and executing work above ground level. Additionally, the Construction (Design and Management) Regulations 2015 (CDM 2015) place specific duties on clients, designers, and contractors to ensure that access solutions are integrated into the overall safety plan of the project.

For buildings over 11 metres or 18 metres, the Building Safety Act 2022 and its associated secondary legislation introduce more stringent oversight. The Building Safety Regulator (BSR) may scrutinise the methods of access as part of the Gateway process for higher-risk buildings. Scaffolding must be designed by a competent person (often a structural engineer) and must comply with BS EN 12811-1. The following table outlines the typical documentation required for scaffolding in a cladding context:

Document TypePurposeResponsibility
Scaffold DesignStructural calculations and layout drawingsQualified Scaffold Designer
Handover CertificateConfirms the scaffold is fit for use after erectionScaffolding Contractor
GA (General Arrangement)Visual map of access points and loading baysProject Architect/Manager
Weekly Inspection ReportStatutory record of safety checks (every 7 days)Competent Person

Considerations for Building Owners and Managers

Directors of Resident Management Companies (RMC) and Right to Manage (RTM) companies often find that scaffolding represents a significant portion of the total project cost in cladding remediation. Beyond the direct hire costs, there are indirect implications for the building’s inhabitants. Scaffolding can impact natural light, ventilation, and the privacy of residents, often requiring the installation of alarms and lighting to mitigate security risks.

Managing agents must ensure that the scaffolding plan accounts for the operational needs of the building. This includes maintaining clear fire egress routes and ensuring that the scaffold does not obstruct essential services or ventilation grilles. The duration for which the scaffold remains in place—often referred to as the "hire period"—must be carefully managed, as delays in material procurement or adverse weather can lead to escalating costs. It is standard practice to require a detailed "licence to occupy" if the scaffold encroaches on local authority land or public highways.

Common Misunderstandings

A frequent misconception is that all scaffolding is "standard" and does not require bespoke design. In cladding remediation, the variable nature of building facades and the weight of modern non-combustible panels often mean that "off-the-shelf" solutions are insufficient. Every scaffold for a major cladding project typically requires a specific design to account for the unique geometry of the building and the specific loads of the materials being handled.

Another misunderstanding involves the impact of scaffolding on building insurance. The presence of a full-height scaffold can alter the risk profile of a property, potentially affecting premiums or requiring specific notifications to the insurer. Similarly, there is often an assumption that once the cladding is installed, the scaffold can be removed immediately. In practice, a "snagging" period is required where the scaffold remains to allow for final inspections and the sealing of the tie-holes mentioned previously.

To understand scaffolding in a technical context, several related terms are frequently employed:

  • Mast Climber (MCWP): A motorised platform that travels vertically on one or more masts. Often used as an alternative to scaffolding for simpler facade geometries.
  • Strike: The process of dismantling a scaffold structure after the works are completed.
  • Tie-Hole Remediation: The process of filling and sealing the points where scaffold ties were anchored to the building substrate through the new cladding.
  • Loading Bay: A reinforced section of the scaffold designed specifically to hold heavy pallets of insulation or cladding panels.
  • Monarflex: A common brand name often used generically to describe the reinforced, fire-retardant sheeting applied to scaffolds.
Rope Access Facade Cleaning on Period BuildingRope access technician on a rooftop uses a pressure washer to clean a stone building facaderope access technician cleaning building facade