Glossary · Two-word term
Cladding Replacement

In short
removal and installation of new external cladding materials on a building
Cladding replacement involves the comprehensive removal of existing external wall systems and the installation of new, compliant materials. This technical process is governed by stringent UK building regulations to ensure structural integrity, thermal performance, and fire safety.
Last updated
On this page
Cladding Replacement
Definition and Scope of Cladding Replacement
Cladding replacement refers to the systematic removal of an existing external wall system and the subsequent installation of new cladding materials. Within the UK built environment, this process is rarely limited to the aesthetic outer layer; it typically encompasses the entire assembly, including the outer rainscreen or render, the support grid, insulation, fire cavity barriers, and the underlying substrate or sheathing board.
The term is distinct from 'cladding remediation', which may involve targeted repairs or the replacement of specific components such as fire barriers without removing the entire facade. Cladding replacement is usually a comprehensive technical intervention intended to bring a building’s external wall system into alignment with current performance requirements, thermal standards, or structural specifications.
The Regulatory Framework in England and Wales
The landscape for cladding replacement is governed primarily by the Building Regulations 2010 and, more recently, the Building Safety Act 2022. For buildings over 11 metres in height, specific statutory requirements apply to the combustibility of materials used in the external wall. In England and Wales, Regulation 7(2) stipulates that external wall materials on 'relevant buildings' above 18 metres must meet European Classification A2-s1, d0 or Class A1 (non-combustible).
The process is oversighted by the Building Safety Regulator (BSR) for high-rise residential buildings (HRBs). A cladding replacement project typically requires a formal Building Regulations application. This involves a multi-stage gateway process designed to ensure that the design, procurement, and construction phases are documented and verified. It is standard practice for a Principal Designer and Principal Contractor to be appointed to manage the risks associated with the design and site works respectively.
Integration with the External Wall System (EWS)
Cladding replacement is fundamentally a structural and thermal intervention. The external wall system must be treated as a holistic assembly rather than a collection of independent parts. When a replacement is undertaken, the compatibility of the new components is a primary technical consideration. This includes the interaction between the new insulation and the original structural frame, as well as the mechanical performance of the fixing systems under wind loads.
The replacement process provides an opportunity to address the 'Golden Thread' of information. This involves creating a digital record of the materials used, their fire performance certifications, and the details of their installation. The objective is to ensure that future building managers have a comprehensive understanding of the building fabric, facilitating long-term maintenance and safety management.
Technical Stages of the Replacement Process
The progression from the identification of a requirement to the completion of works follows a structured sequence. Initial stages involve intrusive surveys and fire risk appraisals of external walls (FRAEW) conducted in accordance with PAS 9980. If these assessments indicate that a replacement is the appropriate course of action, the following technical stages typically occur:
| Stage | Activity | Key Deliverables |
|---|---|---|
| Design | Detailed architectural and fire engineering | Specifications, Drawings, Fire Statements |
| Procurement | Selection of materials and contractors | Tenders, Contracts, Material Data Sheets |
| Removal | Controlled stripping of existing facade | Waste management, Substrate inspection |
| Installation | Fixing of new system and fire barriers | Site records, Photographic evidence |
| Handover | Final inspection and certification | Regulation 38 information, O&M Manuals |
Once the original materials are removed, the underlying building fabric is exposed. This stage is critical for identifying hidden defects, such as corrosion in the primary structure or moisture ingress, which must be rectified before the new system is installed.
Cladding Replacement
Considerations for Building Owners and Managers
Building owners, Resident Management Companies (RMCs), and Right to Manage (RTM) directors hold significant responsibilities during a cladding replacement project. Under the Building Safety Act, the 'Accountable Person' or 'Principal Accountable Person' must demonstrate that all reasonable steps have been taken to ensure building safety.
Understanding the distinction between capital expenditure and service charge recoverable costs is often a central concern. The funding landscape, including the Building Safety Fund (BSF) or the Cladding Safety Scheme (CSS), involves complex eligibility criteria and rigorous technical oversight. Managers must ensure that the replacement project is not only technically sound but also compliant with the financial and legal obligations set out in the leasehold agreements and statutory guidance.
Common Misunderstandings in Cladding Replacement
A frequent misconception is that cladding replacement is a purely cosmetic exercise. In reality, the aesthetic finish is often secondary to the technical performance of the hidden components, such as intumescent cavity barriers and vapour membranes. Another misunderstanding relates to the 'like-for-like' replacement concept; in the current regulatory environment, replacing a material with a modern equivalent often requires a complete redesign of the support structure to accommodate different weights, thicknesses, or fixing requirements of non-combustible materials.
Furthermore, it is sometimes assumed that replacing the cladding will automatically resolve all internal fire safety issues. While cladding replacement addresses the external spread of flame, it does not necessarily rectify internal compartmentation defects or issues with fire doors and alarm systems. These elements must be assessed separately as part of the building’s overall Fire Risk Assessment.
Related Terminology and Technical Definitions
To navigate the documentation associated with cladding replacement, it is necessary to be familiar with several closely related terms:
- PAS 9980: The code of practice for the fire risk appraisal of external wall construction and cladding of existing blocks of flats.
- EWS1 Form: An External Wall System Survey provider’s assessment, often required by lenders to determine the valuation of a property.
- Cavity Barrier: A component designed to close a gap in a cavity to prevent the passage of fire and smoke.
- Rainscreen: The outermost layer of a cladding system designed to shed water and protect the inner structure.
- A1 and A2 Classifications: Ratings under BS EN 13501-1 indicating the combustibility of a material.
Each of these terms plays a role in the technical specification and legal verification of a replacement project. The terminology is specific and carries legal weight under the current UK regulatory framework.
Cladding Replacement