process of identifying hazards and evaluating potential risks in buildings
A risk assessment is a systematic process used to identify hazards and evaluate potential fire and structural risks within a building’s external wall system, facilitating informed decisions regarding safety management, maintenance, and necessary remediation works.
Last updated
On this page
Risk Assessment
Definition and Scope of Risk Assessment
In the context of the UK built environment, a risk assessment is the systematic process of identifying hazards and evaluating potential risks within a building’s structure and operations. Within the cladding and external wall sector, this process focuses on the likelihood of a specific event occurring—typically the spread of fire or a structural failure—and the potential consequences of that event for the occupants and the building itself.
Risk assessments are not static documents but are considered iterative processes. In the cladding industry, they serve to bridge the gap between purely descriptive data (what a material is made of) and evaluative conclusions (how that material performs in its specific environment). The process requires a competent professional to weigh various factors, including the building’s height, its use, the presence of active fire suppression systems, and the specific configuration of the external wall system (EWS).
Application in External Wall Systems (EWS)
When applied to the external wall, a risk assessment typically follows an initial identification phase where the composition of the cladding, insulation, and cavity barriers is established. Because two buildings using the same cladding materials may present different risk profiles due to differences in design, installation quality, or escape routes, the assessment must be site-specific.
During the testing and investigative phase, the risk assessment informs the scope of work. For instance, if a building features a mix of combustible and non-combustible materials, the assessment evaluates whether the arrangement of these materials facilitates or inhibits the spread of fire. In repair or replacement scenarios, the risk assessment is used to prioritise works, ensuring that the most significant vulnerabilities are addressed first. It considers not just the materials themselves, but the "as-built" reality, which may differ from the original architectural intent.
Regulatory Context in England and Wales
The regulatory framework for risk assessments in England and Wales has undergone significant evolution, primarily through the Building Safety Act 2022 and amendments to the Regulatory Reform (Fire Safety) Order 2005. A central requirement is that the "Responsible Person" or "Accountable Person" must ensure that a suitable and sufficient fire risk assessment is undertaken, which now explicitly includes the building’s structure and external walls.
For buildings over a certain height or those deemed higher-risk, the Fire Safety (England) Regulations 2022 necessitate more rigorous documentation. The EWS1 (External Wall System) process, while a valuation tool rather than a statutory requirement, often relies on a Fire Risk Appraisal of External Walls (FRAEW). This appraisal is conducted in accordance with PAS 9980:2022, a code of practice developed by the British Standards Institution (BSI). PAS 9980 provides a methodology for competent professionals to assess the risk of fire spread via external walls and determines whether remediation is necessary to achieve a tolerable level of risk.
Role of the Competent Professional
A fundamental aspect of the risk assessment process is the competence of the individual performing it. In the cladding industry, this typically involves a fire engineer or a suitably qualified building surveyor. The assessor must possess the technical knowledge to interpret laboratory test data (such as BS 8414 large-scale test results) and apply them to the specific geometry of the building in question.
The professional’s role is to provide a balanced judgment. They must account for "mitigating factors"—elements that reduce the overall risk. A table illustrating typical factors considered during a cladding risk assessment is provided below:
| Factor Type | Examples |
|---|---|
| Physical Factors | Material combustibility, cavity barrier integrity, facade height. |
| Operational Factors | Evacuation strategy (Stay Put vs. Simultaneous), occupancy type. |
| Active Systems | Presence of sprinklers, heat detectors, and automated alarms. |
| Passive Systems | Fire doors, protected stairwells, and compartmentation. |
Risk Assessment
Responsibilities for Building Owners and Managers
Building owners, managing agents, and directors of Residents' Management Companies (RMC) or Right to Manage (RTM) companies hold significant legal responsibilities regarding risk assessments. They are tasked with commissioning these reports and, crucially, acting upon their findings. Understanding the distinction between a "hazard" (a potential source of harm) and a "risk" (the likelihood of that harm occurring) is essential for these stakeholders when interpreting technical reports.
Managing agents must ensure that risk assessments are reviewed regularly, particularly when there are changes to the building’s structure, use, or the surrounding regulatory environment. It is also their responsibility to maintain a "golden thread" of information—a digital record of the building's design, construction, and ongoing management—which relies heavily on the data captured during periodic risk assessments.
Common Misunderstandings
A frequent misunderstanding in the industry is the belief that the presence of any combustible material automatically equates to an "intolerable" risk. Current UK guidance emphasizes a holistic approach where the performance of the entire system is evaluated. A risk assessment may conclude that while certain components do not meet the highest fire classification, the overall risk to life safety is managed to a tolerable level through other means.
Another misconception is that a risk assessment is a one-time certification. In reality, it is a living document. Furthermore, stakeholders sometimes confuse a standard Fire Risk Assessment (FRA) with a Fire Risk Appraisal of External Walls (FRAEW). While the former covers general fire safety within the building, the latter is a specialized technical assessment focused specifically on the complexities of the cladding and external wall build-up.
Related Terminology
To navigate the technical documentation associated with cladding risk assessments, it is helpful to be familiar with closely related terms:
- PAS 9980: The British Standard code of practice for the fire risk appraisal of external wall construction and cladding of existing blocks of flats.
- Mitigation: Actions taken to reduce the severity or likelihood of a risk, such as installing a new fire alarm system or replacing specific sections of cladding.
- Tolerable Risk: A level of risk that is accepted in a given context based on a consensus that the cost or effort of further reduction would be disproportionate to the safety gain.
- Life Safety: The primary objective of most fire risk assessments, focusing on ensuring occupants can safely evacuate or remain in a protected environment during an incident.
- Compartmentation: The division of a building into fire-resistant cells to prevent the spread of smoke and flame, a critical factor evaluated during the assessment process.
In summary, the risk assessment serves as the technical foundation for decision-making in the UK cladding industry. It moves beyond simple material identification to provide a nuanced, evidence-based evaluation of building safety, guided by a rigorous regulatory framework and professional standards.