decanting during cladding remediation
Decanting During Cladding Remediation
Managing a major external wall project requires more than just technical engineering; it demands a comprehensive logistical strategy. One of the most significant decisions building owners and managing agents face is whether residents can remain in their homes while work is underway. Decanting during cladding remediation refers to the temporary relocation of residents from their units to alternative accommodation to facilitate safe, efficient, and intensive façade works.

On this page
12 min read
Last updated
Decanting During Cladding Remediation
Managing a major external wall project requires more than just technical engineering; it demands a comprehensive logistical strategy. One of the most significant decisions building owners and managing agents face is whether residents can remain in their homes while work is underway. Decanting during cladding remediation refers to the temporary relocation of residents from their units to alternative accommodation to facilitate safe, efficient, and intensive façade works.
At CladdingTesting.com, we understand that moving residents is a high-stakes decision involving significant legal, financial, and emotional considerations. It is rarely the first choice, but in specific scenarios involving structural instability, high fire risk, or invasive internal-to-external wall ties, it becomes a necessity for safety and project delivery.
Key Takeaways
- Safety First: The primary driver for decanting is resident safety, particularly when fire escape routes are compromised or structural risks are identified.
- Individual Assessment: Whether residents move out during recladding depends on the building’s specific design, the extent of the remediation, and the level of internal disruption.
- Cost-Benefit Analysis: While decanting is expensive, it can significantly accelerate the construction programme, potentially reducing overall project costs.
- Legal Compliance: Managing agents must navigate complex leasehold agreements and statutory duties of care when arranging a temporary decant for cladding works.
- Communication is Critical: Success depends on transparent, early, and consistent engagement with all affected stakeholders.
Decanting during cladding remediation is the process of temporarily moving residents out of a building to allow for extensive façade replacement or structural wall repairs. This occurs when the scale of work, level of noise, or compromise to life safety systems makes the building uninhabitable for the duration of the project.
- Temporary decant cladding works: A planned relocation lasting from a few weeks to several months.
- Partial Decanting: Moving residents only from specific elevations or floors as the work progresses.
- Full Decanting: Vacating the entire building to allow for a comprehensive, accelerated recladding programme.
Do Residents Move Out During Recladding?
In the majority of UK remediation projects, recladding while residents stay is the preferred approach. Modern scaffolding systems and mast climbers allow specialists to work on the exterior without entering individual apartments. However, this is not always feasible or safe.
The decision typically hinges on the External Wall System (EWS) design. If the remediation requires removing the inner leaf of the wall, or if the fire strategy relies on "stay put" advice that cannot be guaranteed during the works, a decant may be mandatory. At CladdingTesting.com, we evaluate every building individually to determine the least disruptive path forward.
When Staying Put is Feasible
Residents usually stay in situ if the work is restricted to the outer cladding panels, cavity barriers, and insulation. In these cases, the primary challenges are noise, loss of light due to scaffolding, and privacy concerns. These are managed through robust "good neighbour" policies and restricted working hours.
When Decanting is Necessary
Decanting becomes the lead option when the building’s structural integrity is at risk, or when the remediation involves the removal of glazing and internal finishes. If the "line of compartmentation" is breached—meaning fire cannot be contained within a single flat during the work—the building effectively fails its life safety requirements for occupancy.
Triggers for Temporary Decant Cladding Works
Identifying the need for a decant early in the cladding works decanting residents process is vital for budgeting and procurement. There are four primary triggers that usually necessitate a move.
1. Fire Safety and Life Safety Risks
If a fire risk assessment (FRAEW) suggests that the existing cladding is so hazardous that a "waking watch" is insufficient during the removal phase, decanting may be the only way to satisfy insurers and the fire service. If the building’s primary fire escape routes are blocked by construction activity, the building cannot remain occupied.
2. Structural Integrity and Stability
During cladding remediation, we occasionally find that the underlying substrate (the material the cladding is fixed to) is failing. If the removal of panels risks the stability of the remaining façade or the internal walls, the area must be cleared of residents to prevent injury from potential collapses.
3. Environmental and Health Factors
Extensive recladding can involve significant dust, vibration, and noise. For vulnerable residents, those working from home, or buildings where hazardous materials like asbestos are found within the wall cavity, temporary decant cladding works provide a necessary health safeguard. The psychological impact of living in a "wrapped" building with no natural light for 12-18 months is also a factor.
4. Access Requirements
Some façade systems require fixings to be installed from the inside out. This involves contractors entering every habitable room, moving furniture, and cutting into plasterboard. Maintaining a domestic life during such invasive work is often impossible, leading managing agents to conclude that residents move out during recladding for these specific phases.
The Challenges of Recladding While Residents Stay
While staying in situ avoids the logistical nightmare of finding alternative housing, it introduces its own set of complex challenges for the façade contractor and the building manager.
Noise and Vibration Management
Drilling into concrete or steel frames creates significant acoustic distress throughout a high-rise building. Contractors must use "quiet" technologies where possible and adhere to strict time slots, but for residents, the disruption remains the number one complaint. Clear communication regarding the schedule of noisy works is essential.
Privacy and Security
With workmen on scaffolding outside windows, privacy is effectively lost. This requires residents to keep blinds closed for extended periods, which impacts mental health and ventilation. Furthermore, scaffolding provides a potential route for intruders, necessitating enhanced site security, CCTV, and alarm systems on the gantries.
Loss of Amenity
Balconies are typically decommissioned and used for storage or access during cladding works. The loss of outdoor space, combined with the "netting" of the building which reduces natural light, can make the living environment feel claustrophobic. Managing these expectations is a core part of the resident liaison officer's role.
Logistics of Cladding Works Decanting Residents
If the decision is made that decanting during cladding remediation is required, the logistical operation must be planned with military precision. This isn't just a construction project; it's a relocation project.
Alternative Accommodation Sourcing
Finding suitable, local accommodation for 50 to 200 households simultaneously is a massive undertaking. Options include:
- Serviced Apartments: Ideal for short-term decants but expensive.
- Rental Market: Hard to secure for fixed terms that match construction schedules.
- Hotel Placements: Only suitable for very short, emergency interventions.
- Phase-based Relocation: Moving residents from one wing of a building to another or to a nearby sister-development.
Financial Responsibility
Who pays for the decant? This is often the most contentious point. Depending on the building’s age and the nature of the defect, funding may come from:
- The Building Safety Fund (BSF) or the Cladding Safety Scheme (CSS).
- Developer Pledges: Many major UK developers have signed a pledge to remediate buildings they built.
- Professional Indemnity Insurance: If the decant is caused by a design or installation error.
- Service Charge: Only as a last resort, and subject to legal challenges under the Building Safety Act 2022.
The "Moving Day" Protocol
A professional decant strategy includes professional packing services, secure storage for excess furniture, and mail redirection. For residents with disabilities, the alternative accommodation must meet specific accessibility requirements (DDA compliance). Failure to address these details can lead to significant delays in the construction start date.
Decanting During Cladding Remediation
Assessing the Building: A Systematic Approach
At CladdingTesting.com, we don't guess whether a decant is needed. we follow a structured assessment process to provide building owners with a clear recommendation.
Step 1: The Technical Survey
We begin with a detailed inspection of the façade. This includes opening up "investigative pits" to see how the cladding is attached to the building structure. If we find that the fire barriers are missing or that the insulation is highly combustible, we move to the risk assessment phase.
Step 2: Risk and Impact Analysis
We work with fire engineers to determine the "tolerable risk." If the remediation can be done safely while the building is occupied by implementing a temporary fire alarm system or a waking watch, we will recommend recladding while residents stay. We only suggest decanting if the risk to life outweighs the disruption of moving.
Step 3: Programme Modelling
We compare two timelines. Timeline A: Working around residents (slower, more expensive per week, lower relocation costs). Timeline B: Working on a vacant building (faster, cheaper per week, high relocation costs). Often, the speed of a vacant-building project saves enough in preliminaries and scaffolding hire to offset a portion of the decanting costs.
Resident Liaison and Communication
The success of cladding works decanting residents hinges entirely on the quality of communication. Residents are often anxious about the safety of their homes and the financial implications of the works.
- Town Hall Meetings: Hold regular sessions (physical and virtual) to explain the why and how of the decant.
- Dedicated Liaison Officers: Provide a single point of contact for residents to voice concerns.
- Written Updates: Weekly newsletters detailing what has been achieved and what is coming next.
- Digital Portals: A place where residents can see the live schedule and book their moving slots.
Transparency is key. If a project hits a delay—which is common in complex façade remediation—residents need to know as early as possible so they can extend their temporary accommodation stays.
Case Study: When Recladding While Residents Stay Fails
In a recent London project, a managing agent attempted to keep residents in situ during a full EWI (External Wall Insulation) replacement. However, once the render was stripped, it was discovered that the blockwork underneath was saturated and crumbling. The dust and moisture ingress into the flats became a health hazard.
The project was halted, and an emergency decant was triggered. This cost the client 40% more than a planned decant would have cost, due to the emergency nature of the relocation and the idle time for the contractors. This highlights why a thorough cladding testing and investigation phase is non-negotiable before works begin.
Legal and Regulatory Framework (UK)
The Building Safety Act 2022 has changed the landscape for cladding remediation. Under the new regime, the "Accountable Person" has a statutory duty to manage building safety risks. If they determine that a building is unsafe for occupation during works, they have the authority to mandate a decant.
However, leaseholders have rights. The Landlord and Tenant Act provides protections regarding the reasonableness of service charges and the standard of alternative accommodation provided. It is essential to have a legal review of the decant strategy to avoid future litigation from leaseholder groups.
Planning for the Return
The decant process isn't over when the residents move out; it's over when they move back in. A "re-occupation" strategy is just as important. This involves:
- Post-Remediation Cleaning: Professional deep cleaning of all units to remove construction dust.
- Safety Certification: Providing residents with the updated EWS1 form and fire safety certificates.
- Handover Packs: Instructions on how to care for new windows or ventilation systems installed during the works.
Advanced Engineering Solutions to Avoid Decanting
For many clients, decanting during cladding remediation is a financial impossibility. In these cases, we look at advanced engineering to make in-situ work safer.
Intumescent Protection
Applying temporary intumescent strips or fire-stopping around windows as soon as the old cladding is removed can maintain a level of fire protection that allows residents to stay.
Modular Replacement
By using pre-fabricated panels that can be "hooked" onto the building quickly, we reduce the time that the internal wall is exposed to the elements. This limits the duration of the highest-impact work.
Off-Site Consolidation
We reduce site traffic and noise by preparing as much material as possible off-site. This shortens the daily working window on the scaffolding, giving residents more "peace and quiet" during the evenings and weekends.
Frequently Asked Questions
Do residents always move out during recladding?
No. Most recladding projects in the UK are completed with residents in situ. Decanting is typically reserved for cases where the internal wall must be breached, where there is a high risk of structural collapse, or where fire safety cannot be managed during the construction phase.
How long does a temporary decant for cladding works last?
The duration depends on the size of the building and the complexity of the façade. A typical decant can last anywhere from 3 to 12 months. Large-scale tower blocks are often remediated in phases to minimize the number of people out of their homes at any one time.
Will the Building Safety Fund cover my moving costs?
The BSF generally focuses on the "capital costs" of the remediation itself. However, in specific cases where decanting is technically necessary to perform the work, these costs may be considered. It is vital to get professional advice on BSF eligibility criteria before committing to a decant.
What happens to my furniture during decanting?
In most professional decant strategies, residents take essential items to their temporary accommodation, while the remainder of their furniture is either moved to a secure room within the flat (away from the windows) or taken to a professional off-site storage facility.
Can I refuse to move out if a decant is ordered?
This is a complex legal area. If the building owner or the local authority (via an Improvement Notice or Prohibition Order) deems the building unsafe, they have the legal right to require you to vacate. Refusing to move can delay critical safety works and may put you in breach of your lease.
Does recladding while residents stay affect property value?
During the works, the property may be difficult to sell or remortgage. However, once the remediation is complete and a clear EWS1 form is issued, the property usually recovers its value as it is now compliant with modern safety standards.
Why Detailed Investigation Matters
The decision to decant should never be based on a visual inspection alone. Cladding testing is the only way to truly understand the risks hidden behind the panels. By performing borescope inspections, thermographic surveys, and material lab testing, we can provide a data-driven justification for the chosen remediation strategy.
If you are a building owner or managing agent facing a cladding crisis, you need a partner who understands the technical, legal, and human elements of the project. At CladdingTesting.com, we specialise in navigating these complexities.
Our goal is always to find the safest and most cost-effective route to compliance. Whether that means a targeted repair programme or a full temporary decant cladding works project, we provide the expertise needed to see the project through to completion. We help you understand exactly what is wrong, what needs to be done, and how to protect your residents every step of the way.
Remediating a high-rise building is a significant undertaking, but it is a solvable problem. With the right planning, the right technical team, and a clear communication strategy, you can restore the safety and value of your building while minimising the impact on the people who call it home.
Decanting During Cladding Remediation